Industrial

Morenci Mine ETPS Tailings Project - Morenci, Arizona
Project Name / Location: Morenci Mine ETPS Tailings Project - Morenci, Arizona
Owner: Freeport-McMoRan Copper & Gold, Inc.
Prime Contractor: URS / Rust Constructors
LEED Certification: N/A
Project Narrative: Located in Eastern Arizona near the New Mexico border, the Freeport-McMoRan Morenci mine site is a open-pit copper mining complex and is one of the largest such in the United States. Spectra Electrical Services, Inc. began work on the project in Sep 2013 and the anticipated completion of the project is Sep 2015. The project consists of the construction of a new Electrical Distribution Building (EDB), branch power distribution, controls and lighting systems feeding the Main Tailings Pump Station, multiple seepage pond sites, the tailings dam material handling automation equipment covering 2 miles of earthen dam and multiple artereal pump stations throughout the seepage collection system. The project covers approximately 10 square miles within the mine complex and has 14 separate "job" sites within the project footprint.
  • Morenci Mine ETPS Tailings Project - Morenci, Arizona
  • Morenci Mine ETPS Tailings Project - Morenci, Arizona
  • Morenci Mine ETPS Tailings Project - Morenci, Arizona
  • Morenci Mine ETPS Tailings Project - Morenci, Arizona
  • Morenci Mine ETPS Tailings Project - Morenci, Arizona
  • Morenci Mine ETPS Tailings Project - Morenci, Arizona
  • Morenci Mine ETPS Tailings Project - Morenci, Arizona
  • Morenci Mine ETPS Tailings Project - Morenci, Arizona
Fueling System Upgrades - Davis-Monthan AFB (Tucson, Arizona)
Project Name / Location: Fueling System Upgrades - Davis-Monthan AFB (Tucson, Arizona)
Owner: US Air Force
Prime Contractor: Rockford Corporation
LEED Certification: N/A
Project Narrative: This project consisted of the repair of or replacement of 10 jet fueling dispensers at various locations located throughout Davis-Monthan AFB. Spectra Electrical Services, Inc. installed power and controls at each location, while coordinating required fueling system shutdowns with the Owner's representatives, the end-users and the General Contractor.
  • Fueling System Upgrades - Davis-Monthan AFB (Tucson, Arizona)
  • Fueling System Upgrades - Davis-Monthan AFB (Tucson, Arizona)
Pecos Rd. Sulfide Station - Mesa, Arizona
Project Name / Location: Pecos Rd. Sulfide Station - Mesa, Arizona
Owner: City of Mesa
Prime Contractor: Blucor Contracting, Inc.
LEED Certification: N/A
Project Narrative: Spectra Electrical Services, Inc. was contracted to provide demo services of the existing sulfide station equipment and to provide electrical, controls and instrumention for the new sulfide station equipment, as well as area and security lighting.
  • Pecos Rd. Sulfide Station - Mesa, Arizona
  • Pecos Rd. Sulfide Station - Mesa, Arizona
EOP Biosolid Handling Improvements & Controls - Sierra Vista, Arizona
Project Name / Location: EOP Biosolid Handling Improvements & Controls - Sierra Vista, Arizona
Owner: City of Sierra Vista
Prime Contractor: PCL Construction
LEED Certification: N/A
Project Narrative: The Sierra Vista Environmental Operations Park (EOP) consists of 640 acres and offers fifty (50) acres of constructed wetlands that, along with native grasses provides a bird and wildlife habitat. At the heart of the EOP is a four (4) million gallon per day capacity wastewater reclamation facility (WRF), which includes a ten (10) acre complete mix/partial mix lagoon system and thirty (30) acres of recharge basins. The complete mix and partial mix treatment ponds include more than forty-five (45) aerators to mix the wastewater in order to nitrify and treat the water. These aerators run 24 hours a day, 7 days a week, 365 days a year. Spectra Electrical Services, Inc. was contracted on this project to provide electrical power distribution, lighting, controls and instrumentation on this project which, when completed, allows for the City of Sierra Vista to collect biosolids for mixture into its composting efforts in lieu of hauling the biosolids to a landfill.
  • EOP Biosolid Handling Improvements & Controls - Sierra Vista, Arizona
  • EOP Biosolid Handling Improvements & Controls - Sierra Vista, Arizona
New Headworks Installation - Payson, Arizona
Project Name / Location: New Headworks Installation - Payson, Arizona
Owner: Northern Gila County Sanitation District
Prime Contractor: Citywide Contracting, LLC.
LEED Certification: N/A
Project Narrative: Working with the General Contractor to coordinate efforts at this existing facility, Spectra Electrical Services, Inc. was contracted to modify existing and install new power distribution, lighting, instrumentation and controls. Additionally, SES performed modificatins and upgrades to the existing SCADA system at the facility.
  • New Headworks Installation - Payson, Arizona
  • New Headworks Installation - Payson, Arizona
  • New Headworks Installation - Payson, Arizona
Aeration Upgrades @ SWRP - Mesa, Arizona
Project Name / Location: Aeration Upgrades @ SWRP - Mesa, Arizona
Owner: City of Mesa
Prime Contractor: Hunter Contracting
LEED Certification: N/A
Project Narrative: This project consisted of the installation electrical power distribution, instrumentation and controls to facilitate the installation of turbo blowers and a fine bubble aeration system at the the City of Mesa's existing Southeast WRP facility.
  • Aeration Upgrades @ SWRP - Mesa, Arizona
ADAL WWTP Improvements - Cannon AFB (Clovis, NM)
Project Name / Location: ADAL WWTP Improvements - Cannon AFB (Clovis, NM)
Owner: US Air Force (administered by the US Army Corps of Engineers)
Prime Contractor: KEAR Civil Corp.
LEED Certification: N/A
Project Narrative: Cannon Air Force Base is located in Eastern New Mexico near Clovis, NM. Spectra Electrical Services, Inc. was contracted to demo, remove, relocate and install new power distribution, emergency generator power, controls and lighting systems for the project and was faced with many coordination challenges due to multiple stakeholders and the fact that the existing WWTP had to maintain operations during construction of this project. All existing headworks, grit and grease collections systems were upgraded during the course of this project. Additionally, a new parshall flume and lift station were added to the existing WWTP. When completed, the project enhanced the processing capacity of the existing WWTP to one million gallons per day, with the installation of a new 250,000 gallon aerobic digester and the conversation of the existing aerobic digester to a sequencing batch reactor.
  • ADAL WWTP Improvements - Cannon AFB (Clovis, NM)
  • ADAL WWTP Improvements - Cannon AFB (Clovis, NM)
  • ADAL WWTP Improvements - Cannon AFB (Clovis, NM)
2MG Resevoir & Pump Station - Gilbert, Arizona
Project Name / Location: 2MG Resevoir & Pump Station - Gilbert, Arizona
Owner: City of Gilbert
Prime Contractor: PCL Construction
LEED Certification: N/A
Project Narrative: Spectra Electrical Services, Inc. was selected as the electrical contractor to install additional electrical power distribution, lighting, lighting protection, EM Generator power and instrumentation at the existing 2MG Reservoir & Pump Station located within the Town of Gilbert for the expansion of processing capacities.
  • 2MG Resevoir & Pump Station - Gilbert, Arizona
  • 2MG Resevoir & Pump Station - Gilbert, Arizona
  • 2MG Resevoir & Pump Station - Gilbert, Arizona
Lake Mary WTP Chlorine Dioxide Facility - Flagstaff, Arizona
Project Name / Location: Lake Mary WTP Chlorine Dioxide Facility - Flagstaff, Arizona
Owner: City of Flagstaff
Prime Contractor: KEAR Civil Corp.
LEED Certification: N/A
Project Narrative: Construction of the new chlorine dioxide facility for the City of Flagstaff at the Lake Mary Water Treatment Plant was comprised of a new masonry building addition for the treatment of raw water from Lake Mary. The project included electrical upgrades, instrumentation and control upgrades for SES.