Taylor Place
Taylor Place
(Phoenix, AZ)

Part of Arizona State University's Downtown Campus, this project is a 366,500 square foot facility. Comprised of twin thirteen-story towers in Downtown Phoenix's Copper Square area, the dormitories will be home to more than 1,000 students upon completion. SES employed BIM (Building Information) Technology on this project, in conjunction with the GC and other major subcontractors.

General Contractor Austin Commercial
Start Date 5/1/2007
Completion Date 8/1/2008
Budget $7.8M
Carl Hayden HS Renovation
Carl Hayden HS Renovation
(Phoenix, AZ)

This project involved the renovation of multiple buildings throughout the existing campus, a complete upgrade of the existing electrical distribution system and a new 28,000 square foot, two-story science & technology classrooms building.

General Contractor Adolfson & Peterson
Start Date 6/1/2007
Completion Date 6/1/2008
Budget $3.8M
Copper Point Development
Copper Point Development
(Phoenix, AZ)

This project is currently in Pre-Construction. It will consist of a four-story, 104-room hotel, multiple retail buildings and a 28-story, 132 unit condominium hi-rise.

General Contractor Pointe of View Development
Start Date 7/1/2008
Completion Date 7/1/2010
Budget $3.5M
Agua Fria High School Renovation
Agua Fria High School Re-model
(Avondale, AZ)

Project scope consist of a remodel of the existing locker rooms, and restrooms. Demo existing light fixtures, Fire Alarm system, and replace with eco friendly lighting, and upgraded Fire Alarm package. Total value $200k.

General Contractor Adolfson & Peterson
Start Date 4/15/2008
Completion Date 8/1/2009
Budget $200K
Wells Fargo Call Center
Wells Fargo Call Center

This was an extremely fast paced installation of a Data / Call Center. This installation included a "cube farm" that is filled with power drops, cable hung fixtures, voice/data, special systems. This facility also housed PC mainframe, and high security areas.

General Contractor McGough
Start Date 7/2005
Completion Date 1/2006
Budget $1.1M
City of Chandler Community Services Building
City of Chandler Community Services Building
(Chandler, AZ)

New construction of a new Police Station, Fire Station, and an addition to a City park, that shared one site. Both facilities were filled with the latest, high tech special systems that are required by Emergency crews. The police station housed community meeting rooms, suspect holding areas, and much needed office space. The Fire Station houses 12 dorm rooms, Fitness room, Day use areas, and Truck bays that are controlled via the Emergency Dispatch system.

General Contractor Turner Construction
Start Date 6/1/2005
Completion Date 8/1/2009
Budget $1.2M
Rose Mofford Sports Lighting Retrofit
Rose Mofford Sports Lighting Retrofit
(Phoenix, AZ)

Scope was to remove and dispose of the original outdated sports lighting fixtures, and reinstall high-tech modern sports lighting fixtures. The new fixtures have PC interface controls, high efficiency ballasts, and better light output.

General Contractor City of Phoenix
Budget $450k
Mohave / River Valley High School Renovations
Mohave / River Valley High School Renovations
(Mohave/River Valley, AZ)

Mixture of new construction, and renovation. The addition of new science labs, gymnasium, electric rooms, Special systems, PA system, Fire Alarm. This was a multi faceted project that was performed concurrent to the normal school curriculum. Many challenges had to be overcome to accomplish the scope of work without disturbing the students and faculty.

General Contractor W.E. Oneil
Start Date 12/2005
Completion Date 12/2006
Budget $1.4M
Microsemi
Microsemi

Ongoing facility upgrades, and maintenance. Microsemi is a leading manufacturer in the semiconductor industry. Multiple systems on this campus have been upgraded by Spectra Electrical Services, including: Toxic gas detection system. High Voltage oil filled transformer, and distribution system installation. Clean Room construction.

Phoenix Day School for the Deaf
Phoenix Day School for the Deaf
(Phoenix, AZ)

Renovation of existing campus facilities and and new buildings.

General Contractor WE O'Neil Construction
Start Date 8/1/2007
Completion Date 6/1/2008
Budget $1.5M
Estrella Performing Arts Center
Estrella Performing Arts Center
(Buckeye, AZ)

New performing arts center located on the campus of Estrella Mountain High School.

General Contractor Adolfson & Peterson
Start Date 11/1/2008
Completion Date 8/1/2008
Budget $900k
911 Call Center UPS Upgrade
911 Call Center UPS Upgrade
(Phoenix, AZ)

Upgrade of existing UPS system (replace old / install additional) and corresponding electrical distribution system upgrades.

General Contractor SES
Start Date 5/1/2008
Completion Date 8/1/2008
Budget $500k
NSA-8 Hangar Complex
NSA-8 Hangar Complex
(Scottsdale, AZ)

25,000 square foot airplane hangar and office complex located in the Scottsdale Airpark.

General Contractor WE O'Neil Construction
Start Date 9/1/2007
Completion Date 5/1/2008
Budget $450k
Walgreen's (Various locations)
Walgreen's
(Various locations)

Spectra has been involved with 14 new Walgreen's stores valley wide, and even in Payson, and Casa Grande. We have also re-modeled many existing Walgreen's stores throughout Arizona.

General Contractor Multiple
Ralston Purina Flagstaff
Ralston Purina Flagstaff
(Flagstaff, AZ)

Spectra has been involved with various Electrical distribution upgrades to the Flagstaff Ralston facility, including a High Voltage switchgear cut-over.

General Contractor Worked directly for Nestle / Ralston
St. Patrick's Church Admin Building
Saint Patrick's Church Admin Building

Project consisted of adding a separate admin building on the adjacent property. 10,000 square foot, including a kitchen, Worship Room, Administrative archive storage, and multi purpose rooms.

General Contractor ForeSite Construction
Start Date 10/2006
Completion Date 7/2007
Budget $250k
ASU Porter & Hect Lab
ASU Porter & Hect Lab Renovations
(Scottsdale, AZ)

Project consisted of demo and "make safe" of the entire facility. New build out of Dr. Porter, and Dr. Hect Labs included negative air hoods, eco friendly lighting, upgraded Fire Alarm, which is tied into to the campus wide system. 22,000 square feet.

General Contractor Turner Construction
Budget $350k
ASU Student Recreation Center
ASU Student Recreation Center

Project scope was to temporarily upgrade the existing Fire Alarm system for the entire building, while occupied, without interruption.

General Contractor Climatic
Budget $180k
Raintree Crossing Scottsdale
Raintree Crossing Scottsdale
(Scottsdale, AZ)

Office complex shell building complete with infrastructure back-bone in place. 17,000 square feet.

General Contractor Valley Commercial Companies
Budget $480k